← Back to policy experiences

Exhibitions inside the European Parliament

Bring your story to where MEPs actually work. We design every exhibition through an Idea Sprint, then build and install it inside Parliament buildings, in Brussels or Strasbourg.

A Bump installation inside the European Parliament: circular orange plinths and planters on a printed floor

Direct visibility

A physical presence inside Parliament buildings, where MEPs work every day.

Political sponsorship

Every EP exhibition is hosted by an MEP who shares your policy objectives.

Designed storytelling

A purpose-built exhibition that tells your story through the space itself.

Room for events

Designed to host the launch and the talks that bring the exhibition week to life.

It starts with an Idea Sprint

How we design every exhibition

A great idea on its own isn’t enough. To build something that actually solves the problem, you need to bring other people with you: colleagues of different seniority and specialism, member organisations, partners. The Idea Sprint is the framework we developed after co-creating with nearly 40 clients over three years. Every EP exhibition we’ve built began with one.

01

Listen

We send your committee of stakeholders a short survey, then follow up one to one. What do you think the problem is? Who do we need to reach or convince? By when, and how will we know we’ve succeeded?

02

Strategise

We turn what we heard into a few strategy options, add whatever audience insight is available, and boil each option down to one top-line message: the single sentence you’d say to an MEP to tell them what you want them to do, and why.

03

Ideate

We look for tactical ways to bring each message to life: designing a museum exhibition around it, immersing your audience in it, gamifying it, casting visitors in the starring role. We make a long list, narrow it down and visualise the strongest few as spatial concepts.

04

Refine

We bring the committee back together and walk them through how we got here. If we listened well, everyone will recognise their own thinking. We combine and cut until the concept is about 85% there, then come back once more for the final 15%.

05

Roll out

We get detailed on content, materials and timing, lock in the plan, and start building.

How long it takesBudget three to six weeks for the sprint. We’ve done it in two when we had to, and speed helps keep momentum.

Read the full Idea Sprint method →

We design and build. Someone else runs the events.

Who does what

An EP exhibition has two halves: the exhibition itself, and the programme of events around it. Bump does the first. We don’t manage events inside the Parliament, so the MEP host, the week’s agenda, speakers and guests are handled by your own team or by a third party, such as a public affairs agency or a media partner like The Parliament.

Bump · always included

Design and build

  • Design. An Idea Sprint that produces the creative concept, the messaging strategy and the spatial design, developed with your stakeholders.
  • Build. Production and installation of the exhibition inside Parliament buildings, in Brussels or Strasbourg.

Not included: managing the events programme inside the Parliament.

Not Bump · your choice

Events and programme

  • Your own team, working directly with your MEP host’s office to run the week.
  • A public affairs agency you already work with.
  • A media partner like The Parliament, who can:
    • advise on your advocacy goals and the EP’s exhibition services and spaces, and find potential MEP hosts
    • plan events across the week, including the opening event, which is often on the Tuesday and usually run by them
    • recruit speakers through their own networks
    • work with your MEP’s assistant to get outside guests into the building

The Parliament quotes for this separately.

Our partnership

Bump is The Parliament’s exclusive design and build partner for exhibitions inside the European Parliament. When they run the programme, we design and build the exhibition. More on the partnership →

What it costs

Design, then build

Every EP exhibition has two phases, both priced upfront. The figures below are our honest starting point. They move with scope and ambition, but a conversation about money should never be the awkward part.

Phase 1
€7,500

Idea Sprint

The design phase: concept, messaging and spatial design, run with your stakeholders over three to six weeks.

Phase 2
€75,000 minimum

Build and delivery

Production and installation of the exhibition inside the European Parliament, in Brussels or Strasbourg.

Not Bump
Quoted separately

Events and programme

Run by your own team, or by a third party such as a public affairs agency or The Parliament, who quote separately. Who does what ↑

Does Bump pitch?

No. If you want to explore ideas together, that happens through a paid Idea Sprint. Unpaid pitches don’t produce the best creative work, and their cost ends up being paid by paying clients. See how we price everything else on the Working with Bump page →

Exhibitions we’ve built in the Parliament

Case studies

Planning an exhibition in the European Parliament?

Tell us what you need MEPs to understand. We’ll talk you through scope, timing and pricing before you commit to anything.

Get in touch